Call nowFree estimate
Cicero, IN

Bathroom remodelingin Cicero, IN

A bathroom that still looks new in ten years. That comes down to what happens before the tile goes on — waterproofing, a flat substrate, and joints sealed properly. We deliver complete bathroom remodels focused on durability, moisture protection, and precise installation.

Completed bathroom with a charcoal herringbone tiled walk-in shower and brass fixtures
Bathroom remodeling in Cicero

What bathroom remodeling in Cicero actually involves

Bathroom with a walk-in glass shower, tiled bench and a freestanding tub

Two kinds of bathroom come up in Cicero, and they fail differently. The first is in a cottage that was winterized a room at a time. That plumbing was originally built to be drained every fall, so supply lines still run through exterior walls or a vented crawl, with stop valves behind panels nobody can reach. When the wall is open we move those lines into interior partitions and put the shutoffs somewhere a person can turn them. It adds a line to the estimate and takes a burst pipe out of the house's future. The second is in a pre-1940 house in town: one bathroom, upstairs, carved out of a bedroom long after the house was built. Plaster and lath, a cast-iron stack boxed into a chase, and joists notched by whoever ran the drain. We open the ceiling below and look at that framing before we write the estimate, not after. Both raise the same two questions. If the house is on a well, iron and hardness mark new fixtures, glass and light grout, so where the softener and filter sit and how they discharge belongs in the plan. If it drains to septic, adding a bathroom is a Hamilton County Health Department review before it is a plumbing job. Lake houses also sit shut for weeks at a time. A humidistat does more here than a bigger fan does.

What we find in Cicero homes

We have been opening walls in Hamilton County since 2012

Cicero is a small town wrapped around the south end of Morse Reservoir. The lake frontage is seasonal cottages that were converted to year-round houses over decades, and the town itself is older, modest stock. The conversions are where the interesting work is.

Commonly, in these houses
  • Former summer cottages winterised in stages, with insulation and heating that stop at whichever wall the last owner reached
  • Lakeside houses built into a slope, giving genuine walkout lower levels with reservoir-facing glazing
  • Older town houses with small original bathrooms and no second one, on lots with room to expand outward if the budget allows
Ground conditions

Well water, clay, and a lot that falls to the reservoir

Two things change the work at a Cicero address. Utilities: plenty of houses out here draw from a private well and drain to a septic field, which turns an added bathroom into a health department question before it is a plumbing one. Ground: heavy clay on a slope that runs to the water, and a thirty to thirty-six inch frost line under anything new. And the address, not the town name, decides who issues the permit.

Well and septic country

Outside the town limits many houses run on a private well and a septic field. Systems are sized by bedroom count, so a basement bedroom or a third bathroom becomes a Hamilton County Health Department question. We raise it before anything gets drawn.

Radon Zone 1

Hamilton County sits in EPA Radon Zone 1, where roughly one house in three tests at or above the action level of 4 pCi/L. It matters most when a lower level or a crawl becomes living space. Worth testing before you finish, not after.

Downspouts and the bank

Clay holds water against a foundation, and freeze-thaw moves it season to season. On a lot that falls toward the reservoir, roof water dumped at the corner also cuts a channel down the bank. Piped discharge that daylights below the house handles both.

Getting to the house

Some lake lanes are narrow, and on the steep lots the drive sits above the house. Cabinets, drywall and tile come down a stair by hand, and the dumpster has to go where it does not block a neighbor. We settle that at the walkthrough.

What’s included

Every project is planned and executed for long-term performance

01

Strip out

  • Demolition and debris removal
  • Electrical and plumbing adjustments
02

The part you never see

  • Waterproof wall and floor preparation
  • Silicone sealing of corners and joints
03

Finish

  • Tile installation and grouting
  • Vanities, mirrors, toilets and lighting fixtures
What this covers

Everything bathroom remodeling covers

Walk-in shower
A tiled shower built on site rather than dropped in: sloped pan, waterproof membrane, tiled walls to the ceiling if you want them, and glass measured after the tile is set so the panels match the wall as built, not as drawn.
Tub-to-shower conversion
The tub comes out and the shower is built in the same footprint. A tub traps at an inch and a half; a shower needs two. So the trap and branch get upsized as well as moved, and the trap-arm run back to the vent gets re-checked.
Curbless shower
No step at the entry, and the waterproofing carries out past the opening. On a slab the drain is cast in concrete, so it means saw-cutting a recess and resetting the trap lower — no framing to open. On a joist floor it means dropping or sistering framing.
Tile installation
Floors, walls, showers, niches and benches. Substrate gets flattened before large-format tile goes down, mortar is matched to tile size and weight, and layout is set dry first so the cuts land at the edges you look at least often.
Vanity replacement
Freestanding, or wall-hung with the trap and supplies moved into the wall and blocking added to carry the load. Drawer bases need a rear-offset drain. We match the top, the faucet drilling and the wall height before ordering anything.
Powder room
Small, seen by everyone, and unforgiving. No shower means no membrane, but the fixture clearances still rule the room: fifteen inches from toilet centerline to any wall, twenty-one inches clear in front. Tile, trim, lighting and vent do the rest.
Accessible bathroom
Aging-in-place work: curbless entry, a wider door opening, a handheld on a slide bar, comfort-height toilet, bench, and solid blocking behind the tile so grab bars lag into wood. The blocking is the part that has to happen before the walls close.
What goes wrong

The five things that turn a bathroom remodel into a repair

Tile set straight onto drywall

Moisture-resistant drywall behind a shower is still drywall. It swells, the tile bond lets go, and it shows up as loose tile near the valve two winters later. Wet walls get cement or foam board with a membrane over them, every time.

No slope under the pan liner

Plenty of older showers were built with the liner laid flat and the mortar sloped on top. Water reaches the liner, sits in the bed, and never dries. When we open a shower and find that, the pan gets rebuilt with the slope under the waterproofing.

Skipping the flatness pass

Large-format tile telegraphs any dip over an eighth of an inch in ten feet as lippage — an edge you can feel with a bare foot. We flatten the substrate first with patch or a self-leveler, because mortar thickness cannot correct it afterward.

Venting the fan into the attic

A fan discharging into an attic or a soffit moves humidity six feet and leaves it there. Through an Indiana winter it condenses on the sheathing and wets the insulation. We run the duct insulated and sloped, and terminate it outdoors through a damper.

Cutting the niche into the wet wall

The wall carrying the valve and supply lines is usually the one people want the niche in, and cutting it means moving pipe. We set niches in a dry stud bay and size them to the tile layout, so the opening lands on grout lines instead of slivers.

Choosing between them

Curbless, curbed or a pan — three ways to build a shower floor

These are not tiers of quality. They are different amounts of structural work, and the right one depends on your floor framing, where the drain already is, and how the room has to be used.

Shower baseWhat it isWhen it makes sense
Curbless, tiledRoom floor and shower on one plane, sloped to a linear or centered drain, with waterproofing carried out past the opening.Aging-in-place bathrooms, slab and basement floors where the concrete can be cut, and upstairs rooms where the framing can be dropped.
Curbed, tiledA built-up curb with a sloped mortar or foam pan, membrane over all of it, and tile matched to the walls.Most second-floor bathrooms. No framing change needed, and the simplest route to a fully tiled shower.
Pre-sloped foam panA factory-sloped foam base bonded to the subfloor, waterproofed on site, then tiled like a mortar bed.When you want a tiled floor without floating mortar — lighter, faster, factory-consistent slope. The subfloor gets flattened and the tray fully bedded; foam spans nothing.
Acrylic or solid-surface panA one-piece factory base bedded in mortar for full support. Backer board and wall tile lap down over the pan flange, siliconed at the base.Rentals, tight budgets, and bathrooms where the floor structure cannot be opened. Fewest joints, fewest ways to fail.
What drives the price

Four things move a bathroom quote

Moving plumbing

Keeping fixtures where they are is the single biggest saving available.

Tile format

Large-format and mosaic both cost more to set than a standard field tile.

Shower build

A curbless, fully tiled shower is more work than a drop-in pan and door.

What's behind the wall

Older houses hide rot and undersized venting. We check first, then quote.

We walk the room, measure, and send a written estimate with materials and labor itemized — so you can see exactly which of these four is costing you money.

Permits and inspection in Cicero

We pull the permit. You do not chase the Town of Cicero, or the Hamilton County Plan Commission.

Inside the town limits Cicero issues its own permits; on the Morse Reservoir shoreline outside them it is the Hamilton County Plan Commission's building inspection division in Noblesville, applying through the county's EZ-Trak system.

All of it is built to the 2020 Indiana Residential Code — the 2018 International Residential Code plus the 2020 Indiana amendments, and we meet the inspector on site rather than leaving you to.

Where we work in Cicero

Cicero and the surrounding area

  • Morse Reservoir
  • Downtown Cicero
  • Red Bridge
  • Bear Slide
  • Christian Park

We are based in Fishers, about 30 minutes from Cicero. That is a drive we make constantly and there is no travel charge — what distance changes is scheduling, not price. We block work in one area into continuous runs rather than splitting a crew across the metro in a day.

What a bathroom remodel costs in Central Indiana

What other people spend, so you have somewhere to start

The typical range

Independent cost research puts a typical Indianapolis-area bathroom remodel around $10,000, with most projects landing between roughly $5,700 and $14,700, and full remodels in the wider metro reported from about $7,500 up past $25,000.

Another way to read it

The same research puts the area rate near $134 per square foot, across a spread of roughly $70 to $250 depending on material level, and a powder room at roughly $2,000 to $5,000.

These are not our prices. They are Angi's Indianapolis bathroom cost research and published Greater Indianapolis contractor cost guides, published in 2026, and they are here because it is a fair question and you deserve a starting point. We do not publish our own ranges, because a number written before anyone has seen your house is a guess. What you get from us is a free walkthrough and a written estimate with materials and labor itemized.

Questions

What Cicero homeowners ask us

My lake house was a cottage originally. Is that a problem?

Not a problem, but it is the reason we open a wall before quoting. Staged conversions leave uninsulated bays, undersized headers and mixed wiring vintages. Finding that on day one is much cheaper than finding it in week three.

Who permits a house on the reservoir?

The town if the address is inside Cicero's limits, and the Hamilton County Plan Commission if it is not. Much of the shoreline is outside. We confirm from the address rather than assuming.

Can a lakeside lower level be finished properly?

Often very well — these are true walkouts with real daylight rather than below-grade rooms. Water still gets checked first. Proximity to the reservoir makes that more important, not less.

Do I need Health Department approval to add a bathroom to our Cicero septic system?

If the house is on septic, plan on a review. Systems are sized by bedroom count and rated flow, so adding fixtures, or turning a basement room into a bedroom, can put you past what the field was permitted for. That sits with the Hamilton County Health Department, separate from the building permit. We raise it at the walkthrough, because it decides the plan rather than the finishes.

Our Cicero house is on a well. Will the water wreck a new bathroom?

Wreck it, no. Mark it, yes. Iron and hardness leave orange staining and scale on new fixtures, glass and light grout, and no sealer holds that off for long. The fix is upstream: softening and iron filtration ahead of the fixtures, with somewhere to discharge the backwash. We settle where that equipment lives while the walls are still open.

Can you remodel a Morse Reservoir lake house we only use in the summer?

Yes, and the off-season is usually the easier run. Two things get settled first: the house stays heated with the water on while we are working in it, and someone can reach us for decisions without driving up. We sweep the site at the end of every day, which matters more in a house nobody is checking on.

How do you get materials to a Cicero lake house where the driveway sits above the house?

By hand, mostly, and it gets planned before it becomes a surprise. We walk the approach during the estimate: where the truck sits, where the dumpster goes without blocking a lane, what comes down the stair in pieces, and what gets protected on the way through. On a tight lot that changes the sequence more than it changes the work.

Is the crawlspace under our converted Cicero cottage worth doing anything about?

Usually. A dirt-floor crawl feeds moisture into the floor above it, and in Radon Zone 1 it is also an open path into the house. A sealed liner over the ground, closed vents and conditioned air change how that floor feels in January. It also gets plumbing out of an unheated void, which is where the winter failures start.

Do we need a permit for a deck at our Cicero lake house?

For a deck attached to the house, yes, and on a bank it is not a small one. Footings bear below frost, roughly thirty to thirty-six inches here, and a slope usually means stepped footings, taller posts and different bracing. Work at the water itself, a dock or a seawall, goes through the reservoir's owner rather than the town. We confirm both before drawing.

How long does a bathroom remodel take?

A straightforward bathroom where the fixtures stay where they are is usually two to three weeks on site. Moving plumbing, or finding something behind the wall that has to be corrected, adds to that. The written estimate carries the schedule alongside the price.

Can I keep using the bathroom during the work?

Not the one being remodeled. If it is the only bathroom in the house we will say so at the walkthrough and plan the sequence to keep the down time as short as it can honestly be.

Why does waterproofing matter so much?

Because it is the difference between a bathroom that lasts ten years and one that fails in three. Tile is not waterproof and neither is grout. What stops water is the membrane and the sealed joints underneath, and that is the part you never see and cannot inspect later.

How a job runs

Four steps, from the first call to the last walkthrough in Cicero

01

Call or send the form

Tell us the room and roughly what you want done. We answer our own phone.

02

Walkthrough & estimate

We measure on site and send a detailed, transparent estimate — materials and labor itemized.

03

Build

Our own crew, code-compliant work, the site swept at the end of every day.

04

Final walkthrough

We go through the finished room with you and clear the punch list before we invoice.

Recent bathrooms
Bathroom with a walk-in glass shower, tiled bench and a freestanding tub
Tiled shower with a recessed niche, a corner bench and a mosaic floor
Bathroom with a white tiled tub surround, a full-width niche and patterned floor tile
Bathroom with a shiplap wall, marble-look vanity and a sliding-glass shower
Why homeowners choose us

What Cicero homeowners are actually choosing between

The person who quotes it runs it

The same crew that walked your house builds the job. You are not handed to a project manager who was not there.

Seven trades in-house

Tile, carpentry, flooring, trim, fireplaces, decks and finish work. One point of contact instead of a general contractor and five subs.

An itemized written estimate

Materials and labor, line by line, before anyone picks up a tool. You know the price at step two of four.

We answer our own phone

Call 317-427-8162 and you get the company, not a call centre. Working across Central Indiana since 2012.

Nearby

Other places we work, near Cicero

Also in Cicero

Free walkthrough, then a written estimate with everything itemized

WhatsApp